Our Achievements

We have achieved 12 Million safe man hours during scaffolding and pipe line work of 4x500 TPH thermax make CFBC boilers at reliance utilities and Power Pvt. Ltd. Dahej, Bharuch, Gujarat Project.

The maximum scaffolding erected in a single month is 225000 cubic metres.

The maximum fabrication of structural steel executed in a single month is 300 MT.

The maximum erection of structural steel executed in a single month is 500 MT.

The maximum man power mobilised in a project is 500.

Our Field of Activities

Scaffolding erection and dismantling works.

Site fabrication and erection of structural steel works.

Pipe line works.

Industrial painting works.

Equipment erection.

Machinery installation.

Construction of industrial buildings.

Operation & Maintenance work.